Project Spotlight

San Diego University

San Diego, CA
Scope:
     
Laurel Village Laurel Village Laurel Village

Corner Bakery

Encinitas, CA & Irvine, CA
Scope: Approximately 11,000 s/f total area poured over spalled and uneven concrete.   Duracap poured at 1.2 mix  (appx 3500 psi) to provide a flat and uniform floor.  Duracap poured in approximately 3-4 hours and turned over to tile subcontractor for a floor ready for direct thin set.

 

Laurel Village Laurel Village

Laurel Village

Redhill Office Building

Costa Mesa, CA
Scope: Contractor removed old gypsum floor from the 80's. Poured back a bullet proof topping of 3/4" Level-Right Self Leveling underlayment over Maxxon MR at 19,000 square feet.
 

 

 
Hartford Commons Blue Apartments

Blue Apartments

Corona High School Gymnasium

Corona, CA
Scope:Set elevations with a laser to provide a flat and level floor to the high tolerance requirements set for a new gymnasium floor. Approximately 12,000 square feet of Dura-cap was poured from 1/4" up to 1-1/2" to achieve this. Geary Hardwood Floors, was given a turnkey floor for their install crew.

 

Hartford Commons

Hartford Commons

 

7979 Ivanhoe

La Jolla, CA
Scope: Approximately 9,500 square feet poured for an office space on 5th floor. The existing floor was out of level as much as 4-1/2". First poured cellular concrete at deeper elevations to minimize weight, followed by a minimum 3/4" topping over Cellular and feather to 0' at highest elevations to provide building owner with a floor within industry standards for FF and FL for new lease.
     
Hartford Commons Hartford Commons

Hartford Commons

Hartford Commons

Del Mar office Building

Del Mar, CA
Scope: Old lightweight concrete at 2nd floor, approximately 6,000 square feet, remove and replace badly deteriorated areas and apply 3/8" cap remaining old lightweight concrete. Work performed for ReSource Floors of San Diego.